VW vehicles with cheating fixes

I use Vento, a good car made by VW the German maker. The car is good and drives very well. I like the handling and the feeling in all respects including the mileage during long runs. But when I read the news about these guys having a software fix to cheat the regulator, I was upset and felt that I have been cheated.

I was waiting for an action by VW the car maker to come up with a plan to respond.

When I saw the response " Volkswagen diesel owners to get $ 1,000 in gift cards and vouchers" I was disappointed.

Will I accept it? No. I will seek alternatives. What are the alternatives I want? My wish list:

  1. I want the software fix removed from my car and new Firmware installed which does not cheat.
  2. I want the improved engine which would limit the emission to acceptable and agreed standards. I do not want to be driving around the car with a cheating engine. 
  3. I want compensation for the time when I will not have the car - period during which the car will be attended to by VW in their workshop for rectifying the defects. 
  4. I will wait for the licensing authority to decide on the fines which the corporate should bear for having mislead the citizens at large. 
If none of the above happens, I would sell my car may be in a year or so and change to a non German car and would through out my life say boldly that Germans can be Cheats.



Quitting Facebook makes one Happy

I read with interest the news item that 'Quitting Facebook makes one Happy' as I tend to agree. It is just by chance that I logged out of Facebook from all my devices a couple of days ago ~ just before the ensuing festival of Deepavali.

I felt better. And I didn't miss much.

And why I didn't I miss this. There are four main reasons:

  1. I finished a novel in the two days; yes back to my old speed in finishing off a novel. 
  2. I felt happy not to see Time, Washington post, The Economist and TED talks. I started feeling the normal person I am instead of what the Facebook posting was trying to turn me to. 
  3. I was glad that I didn't have to see and like the cliches for Deepavali from friends, acquaintances and relatives turned Facebook friends.
  4. And finally, I spent more time out of the web.
I have still not logged on to my account. Yes I do so once in a day and immediately log out. I like it this way and this is going to be the way here afterward.

Today's Readers Editor column " Journalism is more than algorithms" reinforces my belief that Facebook is increasingly assuming that it knows it all and is loosing its humility, in the chase of ever competitive advertising dollar. This approach may undo all that it is good in it. I wish more sense would prevail on them.

Arithmetics - Back to basics - Seriously

"Cast Arithmetics dis us in says BJP" screams the headline of todays "The Hindu". Seriously is the true import has been understood or they have used the message to explain away the results and move on with life as it is.

For the sake of Indian citizens, I wish they do and correct course.

What are the facts which are crying for understanding:

  1. BJP led NDA has secured a little over 38% of the total votes plotted of 56%. Assuming 56% as a good sampling size, it translates to just over 20% of overall state population believes in them. There are 80% who do not believe in them, which includes some who do not care any way. 
  2. BJP has also conceded that the situation was not much different at the Lok Shabha Elections of 2014; meaning they had only one fifth of the population with them when they gained power. 
  3. Having gained power, if you any one had worked to add more to the tally ~ bring in more from the 80% group to their side, then this situation would not have emerged. 
  4. Not only did they not act to bring from other side, they also exhibited their total lack of understanding of the electoral arithmetic and  planned to merge victorious on some whimsical grounds. This has undone them and will continue to hurt till they realise and change their overall approach.
What should be done:

  • Law and order and freedom of action beliefs shall be respected and not be allowed to be politicised as they have peculiar way of impacting if you are in power. 

  • Sake Saath - Sabke Vikas, cannot remain as a mere sloganeering but must be seen to be translated to action. This should be seen to be done irrespective of who claims credit, for in the end once there is vikas, there are very few claimants to it and one of them is none other that our charismatic hard working PM.

  • BHEL Results

    "Celebrating 50 years of Engineering Excellence" screams the caption over the unaudited Financial Results for the quarter ended 30th September 2015 of Bharat Heavy Electricals Limited.

    Being a power sector professional I thought I will spend some time understanding what this '50 years of engineering excellence' has brought to the majority share holder. the average Indian citizen, you and me.

    Here are the highlights:
    1. In a Sales of Rs. 11596 Cr, BHEL has reported a loss of Rs. 292.89 Cr.
    2. Trade receivables at the end of the quarter was Rs. 25868 Cr. To put it in perspective, last year sales was Rs. 29541 Cr (net of taxes). So 87 % of last year Sales is on credit.
    3. Trade payables is Rs. 7944 Cr. 6 months cost of materials is Rs. 6953 Cr.
    4. Employee expenses stands marginally higher at Rs. 1481 Cr ~ 25% of sales.

    My take :
    • Make In India was an actionable diktat in the first 20 years of independence. Later it became a  slogan. The current effort to resuscitate this proven remedy to many of our economies ills, hope succeeds.
    • Administration of contracts and honouring of contractual commitments, on the whole and in particular in power sector is so lax that utilities can arbitrarily, function.
    • Poor negotiating skills of central and state utilities,  with international funding agencies, have resulted in imports of capital goods, over decades, at the cost of local 'Engineering excellence'.
    • Chasing a mirage of saving on initial capital costs and artificially driving for L1 bids across equipment and services, has resulted in under performance, under recovery of costs, eroding capital of major industries. 
    • No planned hand holding of development of technology or solutions is practiced with equipment majors by even central utilities, leaving the country ever dependant on import of technology.
    The collective failure of the central ministries, Power and Industries put together, hence by extension, the entire union cabinet has brought this behemoth to this state. Imagine what happens to other corporates driven and state funded industries in this sector. 

    The current government has its task cutout to address this issue on an urgent basis.

    PSUs ~ Current Models

    PSUs have played a humongous role in building the infrastructure of our country. The model which some of the old timers (people around 50 plus today) are familiar with are the additional role they played in generation of employment, building of local infrastructure such as hospitals and schools. NLC is a standing example. Slowly they became tools in the hands of politicians to scurry favours starting from favouring their constituencies for the next capital investment to influencing employment etc.

    Slowly the PSU transformed to behemoths and became a sink which draining the public exchequer.  So we saw action taken to wound down some of them.

    We also witnessed in the utilities sector emergence of some central utilities like NTPC, PGCIL, NHPC, NHAI and so on so forth. These PSUs are different in as much as they were incorporated by the centre, but as per the concurrent list their main functions fell in the domain of the states. So here we have central utilities built with the cost of equity paid by the state and still not receive any return on the equity, while paying for the services at market determined rates, linked to international bench mark! Over the years, these central utilities have become behemoths and now a need is felt to encourage Private sector.

    So we witnessed a burst of growth in private sector investments especially in two sectors Power Generation and Roads. But that has come down to a trickle owing to various factors. Now efforts are being taken  to entice the corporate back and hope their appetite will emerge.

    In the process, some of the initial roles of PSUs and prime responsibilities got hijacked and we saw unparalleled imports, which has built some of the huge global brands in South Korea and China. This made the Indian corporate to attach themselves to some of these corporations for sustenance. Services rendered by Indian corporates, their accountability to the Indian corporate tax structure never figured in the factors, which weighed in the awards of contracts and investments. Chasing foreign borrowed capital, we threw some of our main strengths ~ namely the size and the strength it offers to negotiate a deal which would benefit the large mass of Indian citizens. 'Made in India' was given the go by. Thankfully once again we hear many nosies about the theme 'Made in India'.

    What else can be done to correct, and bring back the focus the roles PSUs must play:
    • Any capital project constructed in Indian soil shall be done by a Firm registered in India and hence are assessed under the Indian Tax structure. 
    • Open siphoning of margins through 'High Sea Sale' contracts and 'Divisible Contracts' should be done away with.(Any way some of the projects are assigned the exalted status and claim exemption). 
    • Each major infrastructure project generates employment, in the manufacturing sector, services sector and construction sector. PSUs are aware and actively encourage, under the garb of 'L1' bid, firms to work and optimise the cost of engagement of labour. There must be mechanisms which ensure that 'Direct' employees are employed and even 'Contract' labour are eligible for all the benefits. Open recognition of the cost of engaging 'Direct Labour' shall be factored for evaluation of a bid. They shall ensure that the employees who build the project, including the unskilled work force derive all the benefits starting from wages. These should be budgeted and expenditure monitored and shall become reportable in the statements of PSUs. 
    • Cost benefit analysis should include factors like long term benefits to the Economy. Amounts spent in local area development including providing public health services attached to a Power Generation project of a PSU for instance, must be able to access cheap credit from the special schemes of the centre or grants. 
    PSUs have become more important for their ability to raise capital and the other more important factors are being ignored. It is time a major structural reengineering is done and their role is substantially modified.